IN-BUILDING SOLUTIONS

Boston, MA

This project included wiring the entire Park Plaza Boston Hotel with a neutral host DAS system using Corning radio equipment.  It was performed utilizing union labor and provided much needed cell coverage throughout all 17 floors of the building.  The system also included three zones, one being SISO and two being MIMO. The coverage serves not only hotel guests but some of the retail venues and support staff in the dead spaces found throughout the basement level. A total of 26 remote radios and 304 antennas were installed through the building and a small 196 SF room was built out on the 17th floor to house the equipment. The room features fresh air exhausting as well as 2 5-ton AC units and an FM200 Halon Fire suppression system.

T-Mobile SNHU DAS

Rutgers University DAS

Piscataway, NJ

This project involved the installation of a DAS network for Crown Castle USA. The new hub site is located at Rutgers University High Point Solutions Football Stadium. Scope also included electrical, HVAC and roofing work. The success of this project is attributed to a combined effort from Timberline’s General Contracting and Wireless Divisions.

Hooksett, NH

Timberline outfitted the Southern New Hampshire University Arena in Manchester, NH with a single carrier MIMO DAS system. This installation will provide all future events with increased capacity to all T-Mobile users in the arena.  The arena can accommodate up to 11,770 people when a center stage concert is being held there.  The system installed included three zones with 10 antennas on mounts that had to be manufactured as the crews were installing them, due to the intricate walkways and raceways found in the roofing structure of the arena.  We installed three Zones of Ericsson equipment to feed the antennas, as well as the associated cabling throughout the upper catwalk of the facility leading back to a small equipment lease area on the first floor. Timberline assisted T-Mobile in the integration and optimization of the system post construction and the project came in on time for their deadline.

Verizon Park Plaza Neutral Host DAS

Logan International Airport DAS

Boston, MA

Timberline completed a DAS hotel project for six carriers, including Verizon Wireless, which tied into fiber loop that connected Terminal B, C and D. The project included the installation of DAS fiber and antennas inside terminals; providing a complete DAS system.

Democratic National Convention DAS

Boston, MA

Within a three-week timeframe, Timberline worked with Nextel and the Secret Service providing full coverage and safety in the Boston area.  The project included building out sites in three major hotels with the installation of full electrical, HVAC, fire alarm and radio frequency systems.  Antenna units ranged from 250 to 500 plus feet, and were installed by our team working around the clock.

 

Timberline Communications, Inc. fully endorses the national certification program offered by the National Wireless Safety Alliance (NWSA).

Phone: 339-502-5000

Fax: 339-502-5022

 

Main Office:
300 Pine Street

Canton, MA 02021

Northern Office:

78 Londonderry Turnpike, Unit G2

Hooksett, NH 03106

©2019 Timberline Communications Inc.